Commit graph

2 commits

Author SHA1 Message Date
03b2b7d451 chore: rename project Homebase → Furtka, domain furtka.org
Some checks failed
CI / lint (push) Successful in 26s
CI / test (push) Successful in 31s
CI / validate-json (push) Successful in 22s
CI / markdown-links (push) Failing after 2s
furtka.org registered via Strato 2026-04-13, so the working title is
retired. Python package, managed-gateway NS hostnames, and repo URLs all
follow. The CHANGELOG "Unreleased" section documents the switch so the
history is preserved at the 26.0-alpha → next-release boundary.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 21:43:34 +02:00
7759574481 docs: add changelog, contributor guide, release process, and runner setup
- CHANGELOG.md: Keep-a-Changelog format, [26.0-alpha] entry covering
  everything shipped so far (installer webapp, drive scoring, base
  archinstall config, wireframes, competitor analysis, wizard flow spec)
- CONTRIBUTING.md: dev setup, conventional commit format, code style
- RELEASING.md: calendar versioning rules (YY.N-stage, no "v" prefix)
  and the release workflow (bump changelog, commit, tag, push, create
  Forgejo Release)
- docs/runner-setup.md: install + register a forgejo-runner so the
  upcoming CI workflow actually executes

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 20:23:48 +02:00